2016年,Maynmar Unilever正在寻找一家承包商来执行他们的洗衣粉升级项目,他们已经联系了安徽铭志化工设备工程有限公司来执行这项工作。 我们在现有条件下,将他们的洗衣粉生产线的产能从原来的8T/H提升到10T/H,客户夸赞我们“做得很好”。我们为改造项目生产的皮带输送机、沸石LIW、纯碱LIW和彩色颗粒LIW等设备,得到了客户的高度认可和好评。 结果让客户惊叹不已,液体洗涤剂改造项目成为他们最成功的生产线之一。从那时起,它一直运行顺利,不仅在业务成果方面得到了客户的赞赏,在运营和维护方面也得到了他们的工程团队的赞赏。
阅读更多ONE EPC project we have proudly done was in 2019. The Myanmar 5T/H washing powder EPC project was designed and fabricated in-house. Many highlights of this project have been approved and praised by the client, one of which particularly drew their attention was the complete Unilever design scheme with fully automatic feeding and batching that we applied in the project. As an experienced washing powder production line EPC contractor, we value the quality of design as important as the quality of our products. Only good design that comes with easement of use, efficiency and cost& energy saving, can truly able to make the most out of one production line; along with the excellent hardware, a good and long-lasting production line can be finally achieved.
阅读更多SODIUM silicate is one of the important parts of detergent powder. Not only AnhuiMingzhi is capable of carrying out EPC projects as the EPC contractor for washing powder production lines and liquid detergent production lines. Designing the production line for sodium silicate as well as fabricating the required equipment is also one of our specialties. Our most professional engineers are able to execute multiple product production lines including sodium silicate and detergent powder etc. One of the successful cases is the Tanzania 2.5T/H sodium silicate project finished in 2019. Like many other EPC projects, it was designed in-house with our most professional engineers, all equipment was fabricated within by our experienced workers, installed and debugged by our team.
阅读更多